| Whitlock Subdivision Project |
|
|
| Rip Rap stone placed in front of bulkheads not only stops water erosion at the base of the bulkhead, but also stops the bulging and tilting of bulkheads due to hydraulic pressure of the hill behind it. |
| Back to Project Gallery Home |