|
TOM MOSS - (252) 985-8061 |
EDDIE HARDEE - (252) 903-4376 |
|
Welcome to our
Project
Gallery |
|
|
|
|
Coventry Subdivision Before & After |
|
 |
 |
|
This shoreline was classified as
'sensitive shoreline'. We were able to meet the
needs of the property owner and the requirements of Dominion
Power Shoreline Management by protecting the shoreline for many
years to come.
Back To Top |
|
Windy Pointe Subdivision
Click on thumbnail pictures to enlarge photo. |
On the shoreline of this Windy Point Subdivision property, we secured the shoreline and selectively cleared the wooded area. On the shoreline of this Windy Point Subdivision property, we secured the shoreline and selectively cleared the wooded area. On the shoreline of this Windy Point Subdivision property, we secured the shoreline and selectively cleared the wooded area. Windy Point Property - shoreline secured with rip rap. Windy Point Property - shoreline secured with rip rap.
On the shoreline of this Windy Point Subdivision property, we secured the shoreline and selectively cleared the wooded area.
|
|
Back To Top |
|
Lake Gaston
Estates Subdivision
Click on thumbnail pictures to enlarge photo. |
This eroding shoreline needed to be re-sloped with rip-rap to prevent further damage. This eroding shoreline needed to be re-sloped with rip-rap to prevent further damage. This eroding shoreline needed to be re-sloped with rip-rap to prevent further damage. We secured a failing shoreline and provided the rip rap with the proper slope maintaining the shoreline for many more years. We secured a failing shoreline and provided the rip rap with the proper slope maintaining the shoreline for many more years.
This eroding shoreline needed to be re-sloped with rip-rap to prevent further damage.
|
|
Back To Top |
|
Lyons Creek Subdivision
Click on
thumbnail pictures to enlarge photo. |
This bulkhead was on the verge of collapse due to continual soil erosion at the base of the shoreline. This bulkhead was on the verge of collapse due to continual soil erosion at the base of the shoreline. This bulkhead was on the verge of collapse due to continual soil erosion at the base of the shoreline. Two days of work secured this Lyons Creek bulkhead and shoreline. Two days of work secured this Lyons Creek bulkhead and shoreline.
This bulkhead was on the verge of collapse due to continual soil erosion at the base of the shoreline.
|
|
Badck To Top |
|
Cross Creek Subdivision
Click on
thumbnail pictures to enlarge photo. |
Cove lots need less stone per linear foot; rip-rap is recommended due to the increased number of wake board boats producing unusually large waves. Cove lots need less stone per linear foot; rip rap is recommended due to the increased number of wake board boats producing unusually large waves. Cove lots need less stone per linear foot; rip rap is recommended due to the increased number of wake board boats producing unusually large waves. Cove lots need less stone per linear foot; rip rap is recommended due to the increased number of wake board boats producing unusually large waves.
Cove lots need less stone per linear foot; rip-rap is recommended due to the increased number of wake board boats producing unusually large waves.
|
|
Back To Top |
|
Old Ferry Estates Subdivision |
 |
 |
|
Old Ferry Estates - Before |
Old Ferry Estates - After |
A sampling of our Shoreline
Restoration, this property located on the main
lake, has ample stone to secure the shoreline. Notice it
does not extend 25-30 feet up the slope - preserving the
beautiful tree line; yet protecting the soil from further
erosion.
Back To Top |
|
Roanoke Rapids
Click on
thumbnail pictures to enlarge photo. |
Roanoke Rapids - BEFORE - Our largest Job To Date... where we repaired 600 feet of shoreline with an average scar of 14 feet. Roanoke Rapids - BEFORE - Our largest Job To Date... where we repaired 600 feet of shoreline with an average scar of 14 feet. Roanoke Rapids - BEFORE - Our largest Job To Date... where we repaired 600 feet of shoreline with an average scar of 14 feet. Roanoke Rapids - UNDER CONSTRUCTION - Repairing 600 feet of shoreline. Roanoke Rapids - UNDER CONSTRUCTION - Repairing 600 feet of shoreline. Roanoke Rapids - UNDER CONSTRUCTION - Repairing 600 feet of shoreline. Roanoke Rapids - AFTER - Shoreline now secure from further erosion. Roanoke Rapids - AFTER - Shoreline now secure from further erosion.
Roanoke Rapids - BEFORE - Our largest Job To Date... where we repaired 600 feet of shoreline with an average scar of 14 feet.
|
|
Back To Top |
|
Whitlock
Subdivision |
 |
 |
| Whitlock - Before |
Whitlock - After |
|
Rip Rap stone placed in front of
bulkheads not only stops water erosion at the base of the bulkhead,
but also stops the bulging and tilting of bulkheads due to
hydraulic pressure of the hill behind it. Back To Top |